Montgomery County Utility District 4
Pond Erosion Repair.
6965-2501_Invitation to Bidders
City of Lexington
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Central Texas Regional Mobility Authority
project will upgrade the existing WQ pond bedding from stone riprap to concrete riprap, replaces existing gabions and maintains the berms & sand filtration pond. 599 CY 6 Install 5" Concrete Riprap with toe wall; 1,135 SY 7 Excavation of Sand Filter Bed (4"); Setup Erosion Control;
Texas Department of Transportation
Provide Erosion Repair.
Town of Whitewright
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.