Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of modernizing and enhancing campus facilities to better support student success and academic programming.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Urbandale is soliciting bids for construction of a Portland Cement Concrete (PCC) sidewalk project along Aurora Avenue. The work includes approximately 770 SY of PCC sidewalk, about 830 CF of Class 10 excavation, and related removals, restoration, traffic control, erosion control, and survey. The engineer’s estimate is $99,000 (base bid), bids are due February 11, 2026 at 1:30 PM, and completion is required by September 18, 2026.
Posted Date
Jan 23, 2026
Due Date
Feb 11, 2026
Release: Jan 23, 2026
Close: Feb 11, 2026
The City of Urbandale is soliciting bids for construction of a Portland Cement Concrete (PCC) sidewalk project along Aurora Avenue. The work includes approximately 770 SY of PCC sidewalk, about 830 CF of Class 10 excavation, and related removals, restoration, traffic control, erosion control, and survey. The engineer’s estimate is $99,000 (base bid), bids are due February 11, 2026 at 1:30 PM, and completion is required by September 18, 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 16, 2026
Close: Feb 5, 2026
Lighting renovations.
AvailableThis project includes all materials, equipment, transportation and labor needed to construct full depth PCC patches on various residential streets. Project items include full-depth patching, sidewalk removal and replacement, intake reconstruction, fixture adjustments, traffic control, mobilization and restoration.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
This project includes all materials, equipment, transportation and labor needed to construct full depth PCC patches on various residential streets. Project items include full-depth patching, sidewalk removal and replacement, intake reconstruction, fixture adjustments, traffic control, mobilization and restoration.
AvailableWork includes 10 EA removal of structure, intake; 4 EA remove-replace intake floor; 7 EA intake, type sw-501; 1 EA intake, type sw-505; 1 ea manhole adjustment,minor; 305.7 SY removal of sidewalk; 39 LF curb and gutter; 7 SY removal of driveway; 7 SY driveway, paved, PCC, 6"; 156.5 SY sidewalk, pcc, 4"; 135. 7 SY sidewalk, pcc, 6"; 208 SF detectable warnings; 12,298.8 SY full-depth patches, 8" PCC non reinforced, c mix; 400 TON subgrade over-excavation; 1 LS temporary traffic control; 25 cday portable dynamic message signs. See attached file.
Posted Date
Jan 12, 2026
Due Date
Jan 28, 2026
Release: Jan 12, 2026
Close: Jan 28, 2026
Work includes 10 EA removal of structure, intake; 4 EA remove-replace intake floor; 7 EA intake, type sw-501; 1 EA intake, type sw-505; 1 ea manhole adjustment,minor; 305.7 SY removal of sidewalk; 39 LF curb and gutter; 7 SY removal of driveway; 7 SY driveway, paved, PCC, 6"; 156.5 SY sidewalk, pcc, 4"; 135. 7 SY sidewalk, pcc, 6"; 208 SF detectable warnings; 12,298.8 SY full-depth patches, 8" PCC non reinforced, c mix; 400 TON subgrade over-excavation; 1 LS temporary traffic control; 25 cday portable dynamic message signs. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →