Aug 10, 2026
Closes
Aug 27, 2026
Description: NASA/NSSC is soliciting proposals under Notice ID 80NSSC26939777Q-R1 for the fabrication and assembly of high-reliability, 22-layer printed circuit boards for the autoNGC HPSC processor card design IRAD. The requirement is a total small business set-aside under NAICS 334418 and PSC 5998, and vendors must review the attached SOW and RFQ and reference the notice ID when submitting a proposal. This is a procurement solicitation rather than a grant, and offers are due August 11, 2026, at 3:00 p.m. CDT.
Federal · MS, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Procurement and program contacts connected to NASA Shared Services Center.
These related opportunities are still open for bidding.
Aug 10, 2026
Closes
Aug 27, 2026
BERKELEY NATL LAB - DOE CONTRACTOR is soliciting quotes under the U.S. Department of Energy for Axial Adjuster Plates through RFQ MG-08102026. The procurement covers fabrication, assembly, inspection, and testing of HBEND axial adjuster plate magnet assemblies, with related drawings, a statement of work, certifications, and contract terms included in the attachments. This is an active commercial procurement solicitation—not a grant—with quotes due August 27, 2026, at 3:00 PM Pacific Time.
National Research Council Canada
State AgencyON
Jul 22, 2026
Closes
Aug 28, 2026
The National Research Council of Canada (NRC) is procuring fabrication and delivery of mechanical components for its Heavy Impact Test Theater (HITT). The required systems are a modular Hammer assembly, Anvil assembly, Free Sway System, and Surge Restraint System supporting full-scale ice-impact testing. It is a formal RFP rather than a grant, and the page says Amendment 1 responds to Question and Answer 1 while all other terms and conditions remain the same.
CityGA
Aug 3, 2026
Closes
Sep 16, 2026
Replace an existing 8" high pressure plug valve with a new 8" welded, maintenance-free ball valve. The project requires installing the new valve while maintaining system integrity by performing hot tapping and stopping operations. 6' x 40' quadrupole detection loop, the detection loop will be replaced within three days after the pavement work is complete. Utility coordination and Georgia 811 notification prior to excavation. Traffic control. Saw cutting, excavation, trench safety, dewatering, and restoration of the work area. Installation of city-furnished 8" control fittings, piping, valve and associated appurtenances. Fabrication and welding of the replacement valve assembly. Pressure testing of the completed installation. Removal and abandonment of the existing valve. Leak testing, coating/wrapping of exposed steel piping and fittings, and installation of the new valve box. Backfilling, compaction, and restoration of the roadway. Disposal of all waste materials generated during construction.
Special DistrictTX
Aug 1, 2026
Closes
Sep 30, 2026
Design, fabrication, assembly, delivery to Barbours cut and Bayport container terminals, installation, endurance testing, and commissioning of ten dockside electric container cranes.