City of Payson
Work includes 27,140 SF excavate concrete under roadway-no sawcut; 7,600 SF remove sidewalk; 77,750 SF remove existing asphalt; 2 EA kill and cap waterline; 2 EA kill and cap irrigation waterline; 1,795 LF remove curb & gutter and waterway; 42 EA remove and dispose of water meters; 295 LF waterway; 2,500 LF 24" curb and gutter; 4 EA ada detectable warning surface (red plastic); 4 EA ada ramps; 9,500 SF sidewalk; 878 LF striping 4" dashed white. See attached file.
10_25 Public Works - pub - Payson City Main Street Roadway R
zip
City of Salt Lake City
Work includes 820 LF of remove fence, remove sign and post, 4 EA of remove water valve and box, 60 LF of saw cut asphalt pavement, 5,500 cy of unclassified excavation, 4 EA of luminaire, type led, 11,550 clearing and grubbing, 575 SY of asphalt pavement tie-in, 6 thick, class ii, 10,350 CY of portland cement concrete pavement, 11 thick, 3,400 LF of pavement markings, 4 yellow, double solid, paint, with black under, 4,700 LF of pavement markings, 6 white, solid line, paint, with black under, retaining wall.
New Mexico Department of Transportation
Roadway reconstruction.
City of McCleary
Provide architectural and engineering professional services to prepare engineering (PE), right-of-way acquisition services, and construction engineering services for the South Third Street - Oak Street tot Simpson Avenue project includes roadway improvements, pedestrian facilities, drainage improvements, and utility relocations as necessary. Improvements include sidewalks, street lighting, street amenities (landscaping, signage, etc.), and stormwater management systems.
Release
Oct 13, 2025
Close
Nov 13, 2025