Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of but not limited to: reconstruction of existing driveways, parking areas and hma & concrete walkways, as well as proposed electrical and drainage work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The scope of the project consists of the removal of concrete erosion protection and replacing with ABM erosion protecting. Work will include excavation near utilities and work adjacent to the roadway. Concrete curbing will be required. Also includes 1 LS of removal of structures and obstructions (guard rails and posts); 60 CY of drainage excavation; see outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
The scope of the project consists of the removal of concrete erosion protection and replacing with ABM erosion protecting. Work will include excavation near utilities and work adjacent to the roadway. Concrete curbing will be required. Also includes 1 LS of removal of structures and obstructions (guard rails and posts); 60 CY of drainage excavation; see outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of ADA accessible route including curb and barrier free ramps and sidewalk and, installation of ADA door push buttons and actuators and other incidental work. Alternate Bid No. 1 Remount and reset ADA parking area signage. Principal items of work in the project include: Base Bid 1 L.S. Mobilization, Site Preparation and Cleanup 35 S.Y. Concrete Sidewalk, 4" Thick 13 L.F. Curb 1 L.S. ADA Barrier Free Ramp and Handrail 10 S.F. Detectable Warning Surface 1 L.S. ADA Door Improvements Alternate Bid No. 1 1 L.S. Remount and Reset ADA Parking Area Signage.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Construction of ADA accessible route including curb and barrier free ramps and sidewalk and, installation of ADA door push buttons and actuators and other incidental work. Alternate Bid No. 1 Remount and reset ADA parking area signage. Principal items of work in the project include: Base Bid 1 L.S. Mobilization, Site Preparation and Cleanup 35 S.Y. Concrete Sidewalk, 4" Thick 13 L.F. Curb 1 L.S. ADA Barrier Free Ramp and Handrail 10 S.F. Detectable Warning Surface 1 L.S. ADA Door Improvements Alternate Bid No. 1 1 L.S. Remount and Reset ADA Parking Area Signage.
AvailableRelease: Dec 18, 2025
Close: Jan 21, 2026
Provide street paving improvements.
AvailableClose: Jan 14, 2026
Paving improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →