CityTX
Jul 14, 2026
Closes
Aug 5, 2026
Airport Pavement Rehabilitation
Provide airport pavement rehabilitation project.
Description: Pavement Surface Rehabilitation WO # 2558 is a solicitation issued by Richmond Township in Macomb County, Michigan for pavement rehabilitation work on 32 Mile Road between the CN Railroad and the County Line. The project involves approximately 0.62 miles of pavement rehabilitation work in Richmond Township. Bids are submitted through the Michigan Intergovernmental Trade Network (MITN) on BidNet Direct, with submissions due on July 31, 2026 at 11:00 AM EDT.
City · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Township of Richmond.
Adjacent opportunities open for bidding right now.
CityTX
Jul 14, 2026
Closes
Aug 5, 2026
Provide airport pavement rehabilitation project.
CityCA
May 14, 2026
Closes
Jul 30, 2026
Work includes mobilization/clearing and grubbing, 275,200 SF 7' wide 1" ac cold planning/edge grind; 778,100 SF 1. 5" ac overlay; 1 LS crack sealing; 2 EA adjust gas valve to grade; 70 EA adjust water valve to grade; 77 EA adjust manhole to grade; 1 LS striping, including raised pavement markers, lane lines, legends and cross-walks.
Hartstene Pointe Water-Sewer District
Special DistrictWA
Jul 6, 2026
Closes
Jul 31, 2026
Repair and rehabilitation of the Hartstene Pointe Maintenance Association common area roadways. This includes crack sealing, removal and replacement of patches of failing asphalt and adjustment and/or restoration of manhole lids, water valves and monuments within the patch areas.
CityTX
Jul 14, 2026
Closes
Aug 5, 2026
The City of Galveston is soliciting sealed bids for Airfield Pavement Rehabilitation at Scholes International Airport in Galveston, Texas. The project involves comprehensive pavement rehabilitation including spall repairs (3,250 SF), full panel replacements (2,400 SF), joint sealant installation (332,250 LF base bid), crack sealing, and FAA-compliant pavement markings across runways, taxiways, and apron areas. The contract also includes two add alternates: Taxiway E shoulder joint sealant work and Taxiway D crack seal and seal coat operations, with phased construction required to maintain airport operations and a maximum completion timeframe of 334 calendar days.