Summary
Upgrade the two public restrooms. The existing facilities require upgrades to improve accessibility, bring them into compliance with ada requirements, and enhance durability and ease of maintenance. Work includes demolition and removal of existing fixtures. Remove existing floor mounted water closet in both restrooms, including associated piping to the wall and floor. Remove push button flush valves and patch resulting cmu wall penetrations. Remove existing toilet paper dispensers (double and single roll types) and replace with new stainless steel, double jumbo roll, toilet paper dispenser. Existing grab bars and floor drains in both restrooms shall remain in place and shall not be removed.