Closing soon

PATH – Replacement of Fire Main and Associated Components at MacMillan Bloedel Building

Description: Consists generally of filling existing fire main with flowable fill, furnishing and installing ductile iron cement lined pipe (fire main), fire hydrants, post indicator valves, fire department connections, dry pipe valve assembly sprinkler system, sprinkler heads, connection and integration of existing fire alarm, dewatering, replacing fire standpipe enclosures, restoring of asphalt pavement and pavement markings and related work at the MacMillan Bloedel Building at PATH C-Yard and vicinity thereof.