Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the procurement of construction services for the Pascagoula City Hall Improvements Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 28, 2025
Close: Jan 27, 2026
Hall improvements.
AvailableThe City of Roman Forest is soliciting sealed electronic bids for a City Hall expansion and improvements project that includes constructing a new pre‑engineered 2,000‑square‑foot metal building for police department offices with a conference room, lobby, restrooms, and refreshment center. Work includes select fill and reinforced concrete slab/foundation, metal building and architectural finishes, masonry, glazing, doors/hardware, painting, electrical, plumbing, HVAC, and related items. Bids are submitted through CivCastUSA; a non‑mandatory pre‑bid is scheduled for January 7, 2026, at 10:00 a.m. at City Hall.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
The City of Roman Forest is soliciting sealed electronic bids for a City Hall expansion and improvements project that includes constructing a new pre‑engineered 2,000‑square‑foot metal building for police department offices with a conference room, lobby, restrooms, and refreshment center. Work includes select fill and reinforced concrete slab/foundation, metal building and architectural finishes, masonry, glazing, doors/hardware, painting, electrical, plumbing, HVAC, and related items. Bids are submitted through CivCastUSA; a non‑mandatory pre‑bid is scheduled for January 7, 2026, at 10:00 a.m. at City Hall.
AvailableProject consists of refacing the front of the existing city building. There shall be removal of the existing wood veneer. The new face shall include stone veneer and engineered siding. The existing canopy shall include removal of the existing shingle roofing and soffit and install new metal roofing and metal soffit. Also at the canopy, the columns and beams shall be wrapped with the engineered wood to match the siding.
Posted Date
Nov 19, 2025
Due Date
Jan 26, 2026
Release: Nov 19, 2025
Close: Jan 26, 2026
Project consists of refacing the front of the existing city building. There shall be removal of the existing wood veneer. The new face shall include stone veneer and engineered siding. The existing canopy shall include removal of the existing shingle roofing and soffit and install new metal roofing and metal soffit. Also at the canopy, the columns and beams shall be wrapped with the engineered wood to match the siding.
AvailableThe City of Fontana is soliciting bids for the City Hall Renovation Project - Phase II, which involves the demolition of the existing City Hall and construction of a new ~44,451 SF building, along with a multi-level exterior plaza and 111 new ground-level parking spaces. This project also includes remodeling a portion of the Development Services Offices (DSO) building and constructing a pedestrian bridge, with phased demolition and construction to minimize disruption. Bidders must possess a Class A contractor's license (or equivalent), provide 10% bid and 100% payment/performance bonds, and attend a mandatory pre-bid meeting on January 14, 2026.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The City of Fontana is soliciting bids for the City Hall Renovation Project - Phase II, which involves the demolition of the existing City Hall and construction of a new ~44,451 SF building, along with a multi-level exterior plaza and 111 new ground-level parking spaces. This project also includes remodeling a portion of the Development Services Offices (DSO) building and constructing a pedestrian bridge, with phased demolition and construction to minimize disruption. Bidders must possess a Class A contractor's license (or equivalent), provide 10% bid and 100% payment/performance bonds, and attend a mandatory pre-bid meeting on January 14, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis