School DistrictLA
Posted
Oct 28, 2026
Dec 3, 2026
Partial Roof Replacement RFP
Provide partial roof replacement.
Description: Single overall contract for partial roof replacement at Lafayette Mills Elementary School.
SchoolDistrict · NJ, US
Adjacent opportunities open for bidding right now.
School DistrictLA
Posted
Oct 28, 2026
Dec 3, 2026
Provide partial roof replacement.
School DistrictUT
Posted
-
Nov 17, 2026
Roof replacement at Bluffdale Elementary School, including removal of the existing roofing system and installation of a new roof.
School DistrictOH
Posted
Oct 22, 2026
Nov 17, 2026
Work inlcudes remove the existing sheet metal fascia and soffit, remove the existing frt treated plywood sheathing, install new 5/8" frt plywood sheathing, install adhered sheet air and moisture barrier, install new sheet metal fascia, soffit, and attic vents.
School DistrictUT
Posted
Nov 3, 2026
Nov 18, 2026
Work includes replacement of the roof. The replacement of the roof at elementary school. The project consists of the removal of existing roof membrane and partial removal of insulation below and replacement with new single-ply membrane, in areas indicated on drawings.
Decision makers connected to this RFP from Manalapan-Englishtown Regional School District.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval