Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for furnishing all labor and materials for a partial HVAC replacement (Phase I) at Crystal River Middle School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Citrus County School Board is soliciting bids for Phase I of the partial HVAC system replacement at Crystal River Middle School. Prime contractors are required to possess a valid Citrus County School Board Certificate of Pre-qualification before bid submission. Contract documents are available from Verrando Engineering Co. for a refundable deposit for physical copies or free via email for PDF copies. The opportunity was posted on December 10, 2025, with a response deadline of January 20, 2026. Interested vendors should consult the official source posting for complete details.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Citrus County School Board is soliciting bids for Phase I of the partial HVAC system replacement at Crystal River Middle School. Prime contractors are required to possess a valid Citrus County School Board Certificate of Pre-qualification before bid submission. Contract documents are available from Verrando Engineering Co. for a refundable deposit for physical copies or free via email for PDF copies. The opportunity was posted on December 10, 2025, with a response deadline of January 20, 2026. Interested vendors should consult the official source posting for complete details.
AvailableManassas Park City Schools (MPCS) issued an Invitation for Bids (IFB) to replace rooftop HVAC units at Manassas Park Middle School, including replacement of ten RTUs with add alternates, duct/piping modifications, and integration with the existing BAS. The work is planned in phases with Phase I targeted for summer 2026 and will be performed at Manassas Park Middle School, 8202 Euclid Avenue, Manassas Park, VA 20111. Bids were posted in January 2026 and the response deadline is listed as February 3, 2026; no public bid package PDF was found.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Manassas Park City Schools (MPCS) issued an Invitation for Bids (IFB) to replace rooftop HVAC units at Manassas Park Middle School, including replacement of ten RTUs with add alternates, duct/piping modifications, and integration with the existing BAS. The work is planned in phases with Phase I targeted for summer 2026 and will be performed at Manassas Park Middle School, 8202 Euclid Avenue, Manassas Park, VA 20111. Bids were posted in January 2026 and the response deadline is listed as February 3, 2026; no public bid package PDF was found.
AvailableMiddle school HVAC replacement project.
Posted Date
-
Due Date
Jan 19, 2026
Release: -
Close: Jan 19, 2026
Middle school HVAC replacement project.
AvailableTopeka Public Schools is soliciting bids for replacement of the HVAC system at Eisenhower Middle School, including demolition of existing hydronic unit ventilator systems and installation of new rooftop units (RTUs), supporting ductwork, a 600-amp electrical panel, a unit heater, and an exhaust fan. A mandatory pre-bid meeting and site visit are scheduled for 2026-01-20. Bids open 2026-01-13 and close 2026-01-27; submission is via the Public Purchase portal or by mail to the Purchasing Services Office.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Topeka Public Schools is soliciting bids for replacement of the HVAC system at Eisenhower Middle School, including demolition of existing hydronic unit ventilator systems and installation of new rooftop units (RTUs), supporting ductwork, a 600-amp electrical panel, a unit heater, and an exhaust fan. A mandatory pre-bid meeting and site visit are scheduled for 2026-01-20. Bids open 2026-01-13 and close 2026-01-27; submission is via the Public Purchase portal or by mail to the Purchasing Services Office.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →