Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the installation of ADA compliant concrete sidewalk and railing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of renovation and improvements to four public restrooms for compliance with the american with disabilities act (ADA) regulations.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
Work consist of renovation and improvements to four public restrooms for compliance with the american with disabilities act (ADA) regulations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide engineering/architectural services for the twilight public facility ADA improvements.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Provide engineering/architectural services for the twilight public facility ADA improvements.
AvailableRelease: Jan 8, 2026
Close: Feb 18, 2026
Provide ADA Improvements to its Auditorium.
AvailableThe construction of improvements planned as part of the city's 2026 ADA improvements project - 383.6 SY clearing & grubbing; 511.4 SY removal of concrete sidewalks steps, Driveways, curb & gutter, retaining walls & asphalt; 14. CY borrow excavation, MDOT B9 or B9-6, LVM; 50 CY excess excavation, LVM; 386 CY solid sod; 980 LF saw cut, full depth; 10 LF 12" high performance polypropylene (HP) pipe; 456 SY concrete sidewalk (includes ADA ramps), with fiber reinforcement; 54 SY concrete flume; 100 LF combination concrete curb and gutter type 1; 212 SF detecable warning panels, cast in place, maroon; 8 EA adjustment of utility appurtenance; 48 SY concrete pavement 6", with fiber reinforcement; 1 LS maintenance of traffic; 5 EA remove and reset signs, all sizes; 1 LS mobilization; 110 LF concrete retaining wall (6" - 30").
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
The construction of improvements planned as part of the city's 2026 ADA improvements project - 383.6 SY clearing & grubbing; 511.4 SY removal of concrete sidewalks steps, Driveways, curb & gutter, retaining walls & asphalt; 14. CY borrow excavation, MDOT B9 or B9-6, LVM; 50 CY excess excavation, LVM; 386 CY solid sod; 980 LF saw cut, full depth; 10 LF 12" high performance polypropylene (HP) pipe; 456 SY concrete sidewalk (includes ADA ramps), with fiber reinforcement; 54 SY concrete flume; 100 LF combination concrete curb and gutter type 1; 212 SF detecable warning panels, cast in place, maroon; 8 EA adjustment of utility appurtenance; 48 SY concrete pavement 6", with fiber reinforcement; 1 LS maintenance of traffic; 5 EA remove and reset signs, all sizes; 1 LS mobilization; 110 LF concrete retaining wall (6" - 30").
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →