CityCT
Jul 13, 2026
Closes
Aug 12, 2026
Camp Oakdale Pickle Ball Court Parking Lot Improvements
Work includes 20 CY test pit excavation; 50 CY gravel fill; 250 CY processed gravel base; 50 CY crushed stone; 435 TN two course bituminous concrete; 650 LF bituminous concrete lip curbing; 300 SY concrete sidewalk, ramps, and curbs; 40 LF 8" cpp (gasketed, water tight); 1 EA catch basins type "c", "c-l" or "cg"; 2 EA replace catch basin top; 1 EA connect to existing drainage structure; 6 EA plantings: shade trees.