CountyLA
Posted
Sep 22, 2026
Nov 4, 2026
Ozone Park Subdivision Drainage RFP
Work includes removing and replacing driveway culverts and installing subsurface drainage. Also includes 1 LS of temporary signs and barricades; 60 SY of full depth asphalt patching (12") (level 1 superpave with PG67-22); 64 LF of 18" equivalent RCPA storm drain pipe.
