Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
On-call pipe culvert rehabilitation. 40 LF of 18" jacked and bored pipe; 40 LF of 103" X 71" pipe rehab, liner, method C; 100 CY regular excavation; 40 CY rock excavation; 10 CY conc, cl A3 misc. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide on call pipe rehabilitation services on primary and secondary roadways. Work shall include cleaning and preparing the existing pipe, installing and removing cofferdams and pump operations for handling water, application of the liner, application of any grout needed, inspection and testing of liner. The bid pricing shall also include all materials, tools, labor, any traffic control needed, all disposal costs incurred, and any incidentals required to perform the work.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Provide on call pipe rehabilitation services on primary and secondary roadways. Work shall include cleaning and preparing the existing pipe, installing and removing cofferdams and pump operations for handling water, application of the liner, application of any grout needed, inspection and testing of liner. The bid pricing shall also include all materials, tools, labor, any traffic control needed, all disposal costs incurred, and any incidentals required to perform the work.
AvailableReplace holcomb blvd culvert pipe.
Posted Date
Dec 15, 2025
Due Date
Jan 7, 2026
Release: Dec 15, 2025
Close: Jan 7, 2026
Replace holcomb blvd culvert pipe.
AvailableProvide metal culvert pipes.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Provide metal culvert pipes.
AvailableFurnish 2-2/3" x 1/2" and 3" x 1" corrugated riveted or spiral galvanized steel, aluminum, and aluminum coated culvert pipe and also provide solid and perforated plastic pipe. All collars will be 2 feet in length. Nuts and long bolts will be provided with the collars. Specifications as follows: (1) 14 gage. 079" (2) 12 gage. 109" (3) 10 gage. 138" 12" through 48" inclusive, to include span and rise culverts. Plastic pipe 8" through 48".
Posted Date
Dec 10, 2025
Due Date
Jan 5, 2026
Release: Dec 10, 2025
Close: Jan 5, 2026
Furnish 2-2/3" x 1/2" and 3" x 1" corrugated riveted or spiral galvanized steel, aluminum, and aluminum coated culvert pipe and also provide solid and perforated plastic pipe. All collars will be 2 feet in length. Nuts and long bolts will be provided with the collars. Specifications as follows: (1) 14 gage. 079" (2) 12 gage. 109" (3) 10 gage. 138" 12" through 48" inclusive, to include span and rise culverts. Plastic pipe 8" through 48".
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis