Summary
The project entails the installation of a replacement water main to enhance reliability, operational efficiency, and system performance of the distribution system. Work includes approximately 1,500 linear feet of new 8-inch zinc coated ductile iron water main with valves, hydrants, and service connections to replace the aging infrastructure in the general area. The project also includes flushing and air release assemblies, testing and disinfection of the new water main, abandonment of existing pipe that will be removed from service, and the maintenance of traffic (MOT) during construction. Additional work comprises restoration of the pavement, sidewalk, landscaping, and
any other disturbed areas.