Open RFP

P043981 - S-978 (Tugaloo Road) over Middle Tyger River - Bridge Replacement RFP

Description: Work includes replacement of bridge, removal and disposal of existing asphalt pavement 1,343.000 SY, removal and disposal of existing bridge, unclassified excavation 102.000 CY, borrow excavation 1,743.000 CY, fine grading 980.000 SY, maintenance stone 100.000 Ton, liquid asphalt binder pg64-22 35.000 Ton, full depth asph pav patching 8" unif 150.000 SY, asphalt base course - type b 337.000 Ton, asphalt intermediate course type c 148.000 Ton, asphalt surface course type b 220.000 Ton, traffic control, barricade - type iii 168.000 LF, permanent construction signs (ground mounted) 256.000 SF, permanent construction signs (barricade mounted) 164.000 SF. See attached file.

Released
Sep 8, 2026
Closes
Oct 13, 2026(29 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts