Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes widening & slope paving project, which includes approx, 3,300 LF of concrete slope paving, an extension of the existing bike/pedestrian path along the top of the levee.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consist of drainage, slope repair, paving, traffic control, & erosion control.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Work consist of drainage, slope repair, paving, traffic control, & erosion control.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of widening road, includes installation of traffic signals. Work includes improve sidewalk and drainage facility along the north side.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Work consists of widening road, includes installation of traffic signals. Work includes improve sidewalk and drainage facility along the north side.
AvailableProject consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
AvailableWork includes clearing & grubbing, scaling and excavation, installation of soil nails, mesh and hydroseeding to stabilize the hillside. See attached files.
Posted Date
Dec 29, 2025
Due Date
Feb 5, 2026
Release: Dec 29, 2025
Close: Feb 5, 2026
Work includes clearing & grubbing, scaling and excavation, installation of soil nails, mesh and hydroseeding to stabilize the hillside. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →