Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes reconstruction of a traffic signal and installation of a fire signal, along with re-striping and ramp reconstruction work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 9, 2025
Close: Feb 11, 2026
Traffic signal replacement project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installing new equipment, and software to provide traffic signal upgrades in order for six (6) existing signal lights.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
Installing new equipment, and software to provide traffic signal upgrades in order for six (6) existing signal lights.
Provide traffic signal and safety lighting project.
Posted Date
Feb 2, 2026
Due Date
Feb 18, 2026
Release: Feb 2, 2026
Close: Feb 18, 2026
Provide traffic signal and safety lighting project.
AvailableWork includes traffic signal improvements. The design shall include provisions for the removal and replacement of the existing traffic signal system equipment and Americans with disabilities act (ADA)-compliant improvements as required by traffic signal construction to the sidewalk pedestrian ramps. Accessible pedestrian signal (APS) analysis: the consultant shall complete the APS spreadsheet tool for each of the four crosswalks on the project intersections to determine the applicability of accessible pedestrian signal accommodations.
Posted Date
Jan 27, 2026
Due Date
Feb 20, 2026
Release: Jan 27, 2026
Close: Feb 20, 2026
Work includes traffic signal improvements. The design shall include provisions for the removal and replacement of the existing traffic signal system equipment and Americans with disabilities act (ADA)-compliant improvements as required by traffic signal construction to the sidewalk pedestrian ramps. Accessible pedestrian signal (APS) analysis: the consultant shall complete the APS spreadsheet tool for each of the four crosswalks on the project intersections to determine the applicability of accessible pedestrian signal accommodations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →