Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project's work shall consist of construction of 3,500 LF of guardrail to include clearing an grubbing and removal of 2,500 LF of existing guardrail.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Omaha is requesting bids for the construction of 3,500 linear feet of guardrail. This project also involves clearing and grubbing, and the removal of 2,500 linear feet of existing guardrail. The work is to be performed in various locations within the City of Omaha.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
The City of Omaha is requesting bids for the construction of 3,500 linear feet of guardrail. This project also involves clearing and grubbing, and the removal of 2,500 linear feet of existing guardrail. The work is to be performed in various locations within the City of Omaha.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes, but is not limited to, removal or modification of existing roadway wood and metal barrier; installing midwest guardrail system and custom metal barrier; constructing traffic and pedestrian railing; traffic control; concrete work; and all other work related to replacing existing roadway barrier.
Posted Date
Jan 18, 2026
Due Date
Jan 29, 2026
Release: Jan 18, 2026
Close: Jan 29, 2026
Work includes, but is not limited to, removal or modification of existing roadway wood and metal barrier; installing midwest guardrail system and custom metal barrier; constructing traffic and pedestrian railing; traffic control; concrete work; and all other work related to replacing existing roadway barrier.
AvailableConstructing the guardrail and guardrail end anchor installation.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
Constructing the guardrail and guardrail end anchor installation.
Availablehis project consists of ADA curb ramp construction, miscellaneous curb repair and curb inlet top replacement. Approx 500 SY Repair pavement - large area (type OPW 3500); 500 SY repair pavement - small area (type OPW 3500); 300 SY repair Driveway; etc. See attached file.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
his project consists of ADA curb ramp construction, miscellaneous curb repair and curb inlet top replacement. Approx 500 SY Repair pavement - large area (type OPW 3500); 500 SY repair pavement - small area (type OPW 3500); 300 SY repair Driveway; etc. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →