Delaware Department of Transportation
State AgencyDE
Posted
Aug 28, 2026
Sep 22, 2026
Open End- PCC Patching, Central, FY 26 - 29 (Request for Proposal)
Work includes PCC patching, bituminous concrete, dowel bar retrofits, crack and joint sealing, drainage inlets, manhole adjustments, spall repairs, PCC curb and sidewalk, pavement markings. Description: 300 SY of removal of portland cement concrete pavement, curb and sidewalk; 150 CY of GABC, patching; 500 ton of superpave type c, 9.5 mm, pg 64-22, patching; 500 ton of superpave type b, pg 64-22, patching; 25 ton of bituminous concrete and/or cold-laid bituminous (TRM) concrete; 4200 SY of patching pcc pavement, 6' to 15', type a; 1000 SY of patching PCC pavement, 15' to 100', type b; 5000 EA of dowel bars; 425 EA of dowel bar retrofit; 100 EA of longitudinal steel retrofit. See attached file.