Retrieving RFP details
Release
Close
City of Martinez
The work includes but is not limited to a complete interior demolition of the building. This project will remove all the interior non-bearing walls, sheetrock, ceiling tiles, plumbing fixtures, interior counters and cabinets, furnaces, and all electrical to the main panel. Exterior lighting, emergency exit, attic lighting, and alarm monitoring system will be installed or maintained after the demolition to secure the site. The work also includes work by asbestos and hazardous substance removal certified contractors to remove the identified hazardous materials of asbestos and lead containing paint. Asbestos was identified in the floor tiles, cementitious flue piping, gypsum board and joint compound.
City of Schulenburg
Partial interior demolition to a two story building
City of Laurinburg
The project consists of the demolition of specified areas of the building at 127 main street on two floors.
Contra Costa County
Provide security fencing along the perimeter of the scope of work area. Installation of new temporary contractor laydown area. Installation of H-piles to support existing walls and new concrete retaining walls. Infill existing windows at stairwells to remain. Installation of new steel for fence truss support and new chain link fence at new concrete wall. Installation of the new emergency generator, concrete pad, chain link enclosure, conduits, feeders, panels, etc. Provide a fully functioning emergency generator power connection into the electrical panel in the Monticello basement. Installation of new concrete/chain link security wall at play yard east. Installation of chain link security fencing at basketball court area north and east sides. Removal and abatement of all hazardous materials indicated on the contract documents and hazardous reports provided by owner.
Release
-
Close
Nov 04, 2025