Summary
Scope of work: 1- 10’ x 290’ section of “sidewalk” that runs parallel between the pickleball courts and the playground. 1- 14’ x 65’ section of “sidewalk” in between the two pickleball courts o 3’ x 3’ grid with #4 rebar o Compaction for the two sidewalk areas with a minimum of 95% dry density. o Compaction density testing (3-4 Tests) for the two sidewalk areas o Pickleball pad is 12’’ thick “sidewalk” to be based on 8’’ of a “road base material” and 4’’ of concrete. Multiple sections of 6” x 12’’ landscape border as a parameter for the pour in place flooring for the playground (the “sidewalk” will act as the 4th “landscape border” to enclose the 11,185sq’ pour in place flooring). * see plans for exact measurements: 75’- 5”, 41’-6”, 50’-9”, 24’, 55’-3”, 9’-1”, 35’-7” o Drain holes, or Weep holes on northern side of landscape border. o Landscape border is to be built up to remain flush at a 1% grade with the pickleball court. Allowing the 11,185sq’ center to have a 7 ½ ‘’ open center depth. This will allow for the playground surfacing contractor to bring in their 7 ½ ‘’ of buildable material. (see drawing for reference) 1- 16’ x 20’ Handicap parking space pad – UDOT ADA compliant 1- Handicap ramp/access connecting to the 10’ x 290’ “sidewalk” section - UDOT ADA compliant ADA UDOT Ramp Standard o Slope: Maximum 8.33% (1:12) running slope, though 7.5% is often targeted to ensure compliance. o Cross Slope: Maximum 2.08% (1:48) Landings: Minimum 60-inch by 60-inch (5x5 ft) level landing (max 2% slope) at the top of the ramp. o Width: Minimum 4 feet (48 inches) wide, excluding curbs. o Detectable Warnings: Truncated domes are required at all pedestrian crossings. o Flares: Sloped at a maximum of 10% when located in landscaped or non-walking areas, often designated as F1 or F2. To be included: Concrete – All flatwork & landscape border - form, prep, rebar, pour & finish. Hauling in of all fill – base material & transport. Expansion boards in between pickleball courts and “sidewalks”. Compaction. Compaction testing. Setting of forms. Saw cuts for control joints with sealant applied. All labor. Grading to maintain a 1% grade with the pickleball court. Final site cleaned up and removal of all project debris. All sidewalks and landscape border are to be kept flush with the pickleball courts. Material will need to be brought in to achieve this goal. It is highly encouraged to tour the site before bidding.