Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 62,199 CY road & drainage excavation (unclassified); 6,347 ton select granular material; 8,051 CY placing and spreading topsoil; 1,889 CY undercutting; 145 CY furnishing & spreading topsoil; 23,144 CY channel excavation (unclassified); 92 CY foundation fill; 346 LF temporary silt fence (with backing); 7,988 LF temporary silt fence (without backing); 99 EA rock check dam; 12 EA enhanced rock check dam; 1 EA sediment filter bag (15' x 15'); 38 EA catch basin protection (type d); 71 EA curb inlet protection (type 4); 13,690 ton asphalt concrete mix (pg64-22) (bpmb-hm) grading a. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes widening and resurfacing existing lanes, segment 1: mill, overlay and widen +-2. 985 miles; and, segment 2: full depth reclamation and widen +-0. 997 miles. Construct guardrail system, culvert extensions, pave dirt side roads and driveway turnouts, traffic signs and traffic paint/markings
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
Work includes widening and resurfacing existing lanes, segment 1: mill, overlay and widen +-2. 985 miles; and, segment 2: full depth reclamation and widen +-0. 997 miles. Construct guardrail system, culvert extensions, pave dirt side roads and driveway turnouts, traffic signs and traffic paint/markings
AvailableWork includes widening and resurfacing existing lanes, segment 1: mill, overlay and widen +-2. 985 miles; and, segment 2: full depth reclamation and widen +-0. 997 miles. Construct guardrail system, culvert extensions, pave dirt side roads and driveway turnouts, traffic signs and traffic paint/markings
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
Work includes widening and resurfacing existing lanes, segment 1: mill, overlay and widen +-2. 985 miles; and, segment 2: full depth reclamation and widen +-0. 997 miles. Construct guardrail system, culvert extensions, pave dirt side roads and driveway turnouts, traffic signs and traffic paint/markings
AvailableSeeking professional engineering services for an alignment study and for final design services for a roadway project. Consultant shall conduct an alignment study for the widening of road. Develop conceptual design alignments, evaluate the alternative alignments to identify and recommend a preferred alignment considering costs and the traffic, physical, cultural, and environmental features of the project corridor, and prepare preliminary (15%) line & grade plans. Develop a corridor alignment report presenting the alternatives considered. The county's corridor alignment report review checklist is also included as exhibit b, to serve as a guide for the consultant. During negotiations, the county shall provide specific guidance as to the information that will be required in the corridor report and project deliverables. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 28, 2026
Release: Dec 5, 2025
Close: Jan 28, 2026
Safety widening, planing, resurfacing, and traffic stripe.
Posted Date
Jan 15, 2026
Due Date
Jan 30, 2026
Release: Jan 15, 2026
Close: Jan 30, 2026
Safety widening, planing, resurfacing, and traffic stripe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking professional engineering services for an alignment study and for final design services for a roadway project. Consultant shall conduct an alignment study for the widening of road. Develop conceptual design alignments, evaluate the alternative alignments to identify and recommend a preferred alignment considering costs and the traffic, physical, cultural, and environmental features of the project corridor, and prepare preliminary (15%) line & grade plans. Develop a corridor alignment report presenting the alternatives considered. The county's corridor alignment report review checklist is also included as exhibit b, to serve as a guide for the consultant. During negotiations, the county shall provide specific guidance as to the information that will be required in the corridor report and project deliverables. See outside link.
Available