Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of window replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This solicitation requests proposals for removal and replacement/installation of Town Hall windows (Town Hall Window Replacement and Install JB342). The posting was published 2026-01-14 and is open until 2026-01-28 12:00 PM EST; bid documents and contact details require vendor registration on the posting platform. This is a construction procurement (NAICS 238150) and not a grant.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
This solicitation requests proposals for removal and replacement/installation of Town Hall windows (Town Hall Window Replacement and Install JB342). The posting was published 2026-01-14 and is open until 2026-01-28 12:00 PM EST; bid documents and contact details require vendor registration on the posting platform. This is a construction procurement (NAICS 238150) and not a grant.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 14, 2026
Close: Feb 3, 2026
Provide window replacement and install.
AvailableWindow blinds to be removed, stored, cleaned and rehung; Relocate furniture and other furnishings as required to facilitate removal and installation of new windows; Protect furnishings, flooring from debris or other related construction processes; Protect exterior shrubbery, plants and turf from debris and other construction related processes; Remove all caulking residue from exterior; Repair replace as needed, interior drywall, texture and paint; Install new replacement window, attaching to existing structure members. Window to be centered with existing opening as well as the header and sill such that window is promotionally set. Where double windows are installed, both windows are to be set such that all horizontal features are exact; Insulate all four sides of each window with batt insulation and/or expanding foam, ensuring that all cavities are completely filled. The contractor shall ensure the operable windows are easily opened and closed after insulation has been installed and prior to installation of interior trim. Window installations to be inspected by university prior to installation of interior trim. Caulk all joints of frames, and windows. Prep and paint existing interior to match existing at perimeter; Prep and paint interior drywall returns on all side; at the exterior, remove and replace cracked caulking at the juncture of window to brick, window to sill points; caulk joints of new windows; Final clean windows at interior and exterior; relocate furniture/furnishes; Perform quality assurance inspections, prior to university final inspection; The contractor responsible for all measurements required for accurate material quantities and precision installation of windows and associated trim. ADD ALTERNATE NO. 1 Installation of new faux wood, cordless blinds.
Posted Date
Jan 17, 2026
Due Date
Feb 18, 2026
Release: Jan 17, 2026
Close: Feb 18, 2026
Window blinds to be removed, stored, cleaned and rehung; Relocate furniture and other furnishings as required to facilitate removal and installation of new windows; Protect furnishings, flooring from debris or other related construction processes; Protect exterior shrubbery, plants and turf from debris and other construction related processes; Remove all caulking residue from exterior; Repair replace as needed, interior drywall, texture and paint; Install new replacement window, attaching to existing structure members. Window to be centered with existing opening as well as the header and sill such that window is promotionally set. Where double windows are installed, both windows are to be set such that all horizontal features are exact; Insulate all four sides of each window with batt insulation and/or expanding foam, ensuring that all cavities are completely filled. The contractor shall ensure the operable windows are easily opened and closed after insulation has been installed and prior to installation of interior trim. Window installations to be inspected by university prior to installation of interior trim. Caulk all joints of frames, and windows. Prep and paint existing interior to match existing at perimeter; Prep and paint interior drywall returns on all side; at the exterior, remove and replace cracked caulking at the juncture of window to brick, window to sill points; caulk joints of new windows; Final clean windows at interior and exterior; relocate furniture/furnishes; Perform quality assurance inspections, prior to university final inspection; The contractor responsible for all measurements required for accurate material quantities and precision installation of windows and associated trim. ADD ALTERNATE NO. 1 Installation of new faux wood, cordless blinds.
AvailableRelease: Oct 22, 2025
Close: Feb 13, 2026
Memorial hall historic window restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →