Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes parking lot improvement /replace four existing AHU. Bid Package 1 - Mechanical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
OSU Facilities Management, under the direction of the Board of Regents, is soliciting bids for the OKC Annex Parking project at the OSU‑OKC campus. The scope includes parking lot improvements and replacing four existing air handling units (AHUs), with bid packages managed by the construction manager. A mandatory pre‑bid is scheduled for December 30, 2025, and bids are due January 7, 2026, at 10:00 AM CST at OSU‑OKC.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
OSU Facilities Management, under the direction of the Board of Regents, is soliciting bids for the OKC Annex Parking project at the OSU‑OKC campus. The scope includes parking lot improvements and replacing four existing air handling units (AHUs), with bid packages managed by the construction manager. A mandatory pre‑bid is scheduled for December 30, 2025, and bids are due January 7, 2026, at 10:00 AM CST at OSU‑OKC.
Premium
Access the largest public sector contact database
Major components of project work consist of the existing built-up roofing and PVC as removed and replaced with new 30-year warranty PVC roof system and new rigid insulation system including flashing, replacement of the existing roof drains, downspouts, gutters and new parapet flashing where required. Building to have tapered insulation with positive slope to gutters. Lead based paint and asbestos-containing materials (ACMS) have been found on the roof.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Major components of project work consist of the existing built-up roofing and PVC as removed and replaced with new 30-year warranty PVC roof system and new rigid insulation system including flashing, replacement of the existing roof drains, downspouts, gutters and new parapet flashing where required. Building to have tapered insulation with positive slope to gutters. Lead based paint and asbestos-containing materials (ACMS) have been found on the roof.
Availablework is only for Parking Lot “A” which is approx 8.66-acres and is currently a mix of gravel, chip seal and asphalt.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
work is only for Parking Lot “A” which is approx 8.66-acres and is currently a mix of gravel, chip seal and asphalt.
Work includes 182,000 GSF, 4-story, 570-space cast-in-place concrete parking structure. See outside link.
Posted Date
Oct 16, 2025
Due Date
Dec 29, 2025
Release: Oct 16, 2025
Close: Dec 29, 2025
Work includes 182,000 GSF, 4-story, 570-space cast-in-place concrete parking structure. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis