Ohio Adjutant General's Department
State AgencyOH
Posted
Aug 19, 2026
Sep 4, 2026
Barracks Building 3 Reno Camp James A. Garfield (CJAG) (Request for Quote)
Work include 22 EA of replacement of 36" interior doors; removal of existing 4" system; replacement with complete, fully functional commercial-grade 6" gutters, downspouts, flashing, and associated mounting hardware; update the existing air conditioning and heating system to increase performance and capacity in accordance with ufc 3-410-01. Update any outdated building mechanical equipment associated with the hvac system. Replace all existing head units and their respective outdoor condenser units to improve overall air distribution and cooling capacity. 4 EA Mandatory Replacement: All four (4) residential-style furnaces are original to the building (approx 18 years old) and require complete replacement.