Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of installing approx 690 LF of 4" dr 9 dips hdpe sanitary sewer force main by open trench and jack and bore methods.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of approx 1,150 LF of 20" water main using open cut construction and 200 LF Jack & Bore trenchless construction, fire hydrant assembly and removal, and associated paving and street rebuilding within the project limits. Connect to existing water main 2 ea, 20" ductile iron (cl 52) water main 1,150 lf, 20" ductile iron (cl-56) water main 30 lf, cut & cap (existing ci) 5 ea, valve abandonment 1 ea, valve removal 3 ea, 20" butterfly valve 4 ea, 20" di fittings 28 ea, 20" insertion valve 2 ea, 8"kicker joint 1 ls, fire hydrant assembly 3 ea, fire hydrant removal 36 ea, pilot tube guided bore 210 lf. See outside link.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of approx 1,150 LF of 20" water main using open cut construction and 200 LF Jack & Bore trenchless construction, fire hydrant assembly and removal, and associated paving and street rebuilding within the project limits. Connect to existing water main 2 ea, 20" ductile iron (cl 52) water main 1,150 lf, 20" ductile iron (cl-56) water main 30 lf, cut & cap (existing ci) 5 ea, valve abandonment 1 ea, valve removal 3 ea, 20" butterfly valve 4 ea, 20" di fittings 28 ea, 20" insertion valve 2 ea, 8"kicker joint 1 ls, fire hydrant assembly 3 ea, fire hydrant removal 36 ea, pilot tube guided bore 210 lf. See outside link.
AvailableWork consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
AvailableWork consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
AvailableLouisville Water Company is soliciting bids to replace a 16‑inch water main along Ohm Drive in Louisville, Kentucky. The project includes installation of new ductile iron water main and associated appurtenances with restoration along the project limits. Bids are due on February 11, 2026, at 11:00 AM Eastern Time.
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
Louisville Water Company is soliciting bids to replace a 16‑inch water main along Ohm Drive in Louisville, Kentucky. The project includes installation of new ductile iron water main and associated appurtenances with restoration along the project limits. Bids are due on February 11, 2026, at 11:00 AM Eastern Time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →