Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply proven microbiological odor-control chemical(s) and optional support services (initial dosing plan, feed-rate adjustments, delivery and SacSewer-escorted tank fill-up, field sampling, troubleshooting, and system optimization) for the S016 pump station wet well and 3,650-ft force main. Three-year contract with two one-year extension options; SacSewer provides two 275‑gallon storage tanks and two injection pumps. Chemical expectation: bacterial concentration >1 billion CFU/mL. Vendor must meet bonding and applicable DIR/labor requirements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
Posted Date
Sep 12, 2025
Due Date
Dec 17, 2025
Release: Sep 12, 2025
Close: Dec 17, 2025
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
AvailableDemolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
AvailableProject includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" plug valve; See Outside link
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" plug valve; See Outside link
AvailableWork will include pump station piping and pump removal and replacement/upgrades; installation of an emergency backup generator; necessary electrical upgrades; manifold of existing force mains; coating of the existing wet well; and all other associated activities.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Work will include pump station piping and pump removal and replacement/upgrades; installation of an emergency backup generator; necessary electrical upgrades; manifold of existing force mains; coating of the existing wet well; and all other associated activities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis