Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
AvailablePremium
Access the largest public sector contact database
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" plug valve; See Outside link
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" plug valve; See Outside link
AvailableWork will include pump station piping and pump removal and replacement/upgrades; installation of an emergency backup generator; necessary electrical upgrades; manifold of existing force mains; coating of the existing wet well; and all other associated activities.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Work will include pump station piping and pump removal and replacement/upgrades; installation of an emergency backup generator; necessary electrical upgrades; manifold of existing force mains; coating of the existing wet well; and all other associated activities.
AvailableReplacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.