CountyMD
Posted
-
Dec 10, 2026
Mystic Harbour WWTP Biosolids Upgrade RFP
WWTP biosolids upgrade. Project generally consists of, but is not limited to, the construction and installation of primary screening improvements including replacement of the existing primary screens and compactors; installation of two (2) new sludge holding tanks; a mechanical dewatering system; sludge transfer pumps; sludge mixing blowers; and a new CMU dewatering building to house the associated equipment. The work also includes rehabilitation and extension of the existing sludge drying beds and greenhouses; construction of two (2) new sludge drying beds and greenhouses; site work; yard piping; associated demolition; miscellaneous structures; water quality monitoring and analytical instrumentation; and installation, integration, and programming of new equipment and systems into the existing SCADA system. The work also includes the rehabilitation/modification of an existing building into a storage building. The work also includes all requirements to provide fully finished and operable facilities including miscellaneous items and operations as shall be indicated, shown, specified or required to complete the work.
