Summary
The project involves the construction of a new detention pond with storm sewer improvement, which will aid to route stormwater flows into the detention pond, including all labor, equipment, materials and incidentals required for the project. Approx 36 LF of 18" Reinforced Concrete Pipe (Rubber Gasket Joints), All Depths, Including Post TV Inspection; 409 LF of 24" Reinforced Concrete Pipe (Rubber Gasket Joints), All Depths, Including Post TV Inspection; 127 LF of 30" Reinforced Concrete Pipe (Rubber Gasket Joints), All Depths, Including Post TV Inspection; 195 LF of 36" Reinforced Concrete Pipe (Rubber Gasket Joints), All Depths, Including Post TV Inspection; 83 LF of 42" Reinforced Concrete Pipe (Rubber Gasket Joints), All Depths, Including Post TV Inspection; 157 LF of 54" Reinforced Concrete Pipe (Rubber Gasket Joints), All Depths, Including Post TV Inspection; 160 LF of 8" PVC C-900 Water Line, Including Fittings & Restraints;