CityID
Posted
Sep 17, 2026
Oct 12, 2026
Oaks Lift Station Upgrade RFP
Work consists of upgrades to the Oaks Lift Station.
Description: The City of Meridian is soliciting sealed bids for the Oaks Lift Station Upgrade, an infrastructure project involving improvements to the existing wastewater lift station. The work includes mechanical, plumbing, and electrical upgrades, installation of 625-gpm submersible chopper pumps, and temporary pumping systems during construction. This is an open invitation to bid as of 2026-09-23, with substantial completion required within 220 calendar days and final completion within 250 calendar days after notice to proceed.
City · ID, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityID
Posted
Sep 17, 2026
Oct 12, 2026
Work consists of upgrades to the Oaks Lift Station.
Burlington Electric Department
Special DistrictVT
Posted
Aug 28, 2026
Oct 15, 2026
Development, installation, and integration work for a new SCADA (Supervisory Control And Data Acquisition) system built on the Inductive Automation Ignition platform for control of the McNeil Generating Station power plant.
Special DistrictFL
Posted
Sep 6, 2026
Oct 8, 2026
Supply and deliver pumps, pump bases, pump base plates, pump power cables (minimum 60-foot length), control panels, floats, guide rails, float hangers (one per station), gaskets or seals, transducers, spare parts, and ancillary items necessary to ensure a fully functional lift station pump and panel system.
CityFL
Posted
Sep 2, 2026
Oct 7, 2026
The work is described in general, non-inclusive below: 1. Civil Components: Elevation of wet well and valve vault, grading, vegetation removal, sodding, fence and gate removal and reinstallation, and site restoration. 2. Mechanical Components: Removal and replacement of the gate valves, check valves, and pump out connection within the existing valve vault. Installation of pipe supports. Removal and replacement of the pump guide rails to accommodate the new wet well height. Installation of new access hatches with fall protection. Contractor shall provide bypassing pumping system required for rehabilitation of lift station. 3. Electrical Components: Removal and replacement of the Lift Station control panel. Contractor to provide new termination boxes, equipment racks, grounding, and installation of new level floats.
Decision makers connected to this RFP from City of Meridian.