Summary
Work consists of removal of approx 57,800 SF of existing Asphalt Shingles, Underlayment, flashing, drip edge and ridge vents & Installation new ice & water shield. New work includes installation of new ice and water shield, new underlayment, new 50-year architectural asphalt shingles and all associated flashings, drip edge, ridge vents. Work also includes removal of existing single ply membrane and existing insultation on the barrel roof and installation of new 80 MIL single-ply roof membrane over new 6” rigid
insulation. Work includes new metal coping, flashings, terminations, gutters, and downspouts.