Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1. Roadway Construction: a. The extension will replicate the existing NW 115th Avenue cross section, including: • Two 12-foot-wide travel lanes (divided). • A 24-foot-wide raised median. • Paved and unpaved shoulders on both sides of the roadway. • Open drainage system with roadside stormwater treatment facilities. 2. Pedestrian and Bicycle Facilities: a. Installation of a 5-foot-wide sidewalk along the south side of the new roadway segment. 3. Lighting and Landscaping: a. Installation of roadway lighting to ensure visibility and safety. b. Landscaping within the median and along the shoulders as required to match existing roadway aesthetics and meet City standards.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
AvailableRelease: Nov 26, 2025
Close: Jan 7, 2026
Work includes extension of street.
AvailableProvide consulting services for the pennsylvania avenue extension bridging study.
Posted Date
Nov 4, 2025
Due Date
Dec 19, 2025
Release: Nov 4, 2025
Close: Dec 19, 2025
Provide consulting services for the pennsylvania avenue extension bridging study.
AvailableSanitary sewer extension. Work associated with this contract area generally includes approx. 450 LF of 6" PVC gravity sewer; 2,500 LF of 8" PVC gravity sewer; 300 LF of 6" PVC house service pipe; 25 manholes; and 17 customer service wyes, together with necessary appertaining work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Sanitary sewer extension. Work associated with this contract area generally includes approx. 450 LF of 6" PVC gravity sewer; 2,500 LF of 8" PVC gravity sewer; 300 LF of 6" PVC house service pipe; 25 manholes; and 17 customer service wyes, together with necessary appertaining work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis