Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide nutrition center oven replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
Posted Date
-
Due Date
Dec 16, 2025
The State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
Premium
Access the largest public sector contact database
Business Center BC11 MER Replacement of Insulation.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
Business Center BC11 MER Replacement of Insulation.
AvailableInstall 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
AvailableProject scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
Posted Date
Oct 28, 2025
Due Date
Dec 18, 2025
Release: Oct 28, 2025
Close: Dec 18, 2025
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis