Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation phase #2 - millwork & flooring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
For millwork, flooring, painting, gypsum assemblies.
Posted Date
Jan 4, 2026
Due Date
Jan 27, 2026
Release: Jan 4, 2026
Close: Jan 27, 2026
For millwork, flooring, painting, gypsum assemblies.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
Posted Date
Dec 12, 2025
Due Date
Feb 19, 2026
Release: Dec 12, 2025
Close: Feb 19, 2026
Phase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
AvailableThe Metropolitan Council is soliciting bids for the Light Rail Training Center Renovation Phase II (Rebid), Project No. 64107. Scope includes interior and exterior remodeling, added restrooms and training spaces, HVAC/power/data/life-safety extensions, contaminated soil removal, façade repair, parking and stormwater updates; the MCUB participation goal is 14%. Bidders must register as plan holders and submit bids electronically through QuestCDN (eBidDoc™ Project 10003728); a pre-bid meeting (Teams) and site visit are scheduled in January 2026.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The Metropolitan Council is soliciting bids for the Light Rail Training Center Renovation Phase II (Rebid), Project No. 64107. Scope includes interior and exterior remodeling, added restrooms and training spaces, HVAC/power/data/life-safety extensions, contaminated soil removal, façade repair, parking and stormwater updates; the MCUB participation goal is 14%. Bidders must register as plan holders and submit bids electronically through QuestCDN (eBidDoc™ Project 10003728); a pre-bid meeting (Teams) and site visit are scheduled in January 2026.
AvailableNaselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
Posted Date
Dec 8, 2025
Due Date
Feb 5, 2026
Release: Dec 8, 2025
Close: Feb 5, 2026
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →