Aug 17, 2026
Closes
Sep 1, 2026
Tailwater and Control Tower paving, sealing, and striping for Nolin River Lake
This active solicitation is a 100% small-business set-aside for paving, sealing, and striping work at Nolin River Lake in Mammoth Cave, Kentucky. The contractor must provide all labor, materials, supplies, tools, and equipment, begin within 10 calendar days of the notice to proceed, and complete the work within 90 calendar days; award will be based on the lowest total price and bid bonds are required. A site visit is highly recommended, and quotes are due on September 1, 2026.