Special DistrictIL
Aug 6, 2026
Closes
Aug 20, 2026
Warrington Park Trail Paving Project
Work will include installing erosion and sediment control measures, preparing path subgrade, installing HMA pavement, restoring and stabilizing disturbed areas adjacent to the path, and hauling away and disposing of all debris and excess materials.