City of Chesapeake
Work includes 200 CF demolition and repair of concrete using surface spall, detail 2 on sheet S203; 600 CF demolition and repair of concrete using formed spall, detail 3 on sheet s203; 5,000 SF steel recoating; 1 LS water treatment plant groundwater reverse osmosis system replacement.
Northwest River Water Treatment Plant Groundwater Reverse Osmosis Replacement
zip
Release
Jan 02, 2025
Close
Feb 14, 2025