Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Northeast interceptor sewer project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 60 LF 18" sanitary sewer; 2,200 LF 15" sanitary sewer; 1,560 LF 12" sanitary sewer; 2,380 VF 4' dia. sanitary MH; 6,400 LF silt fence; 5,760 SY erosion mat.
Posted Date
Jan 16, 2026
Due Date
Feb 2, 2026
Release: Jan 16, 2026
Close: Feb 2, 2026
Work includes 60 LF 18" sanitary sewer; 2,200 LF 15" sanitary sewer; 1,560 LF 12" sanitary sewer; 2,380 VF 4' dia. sanitary MH; 6,400 LF silt fence; 5,760 SY erosion mat.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and replacement of three (3) existing sanitary sewer interceptor manholes located in tidally influenced areas. Work includes demolition and removal of existing manholes; installation of new armorock polymer concrete manholes; connection to existing sewer piping; project dewatering; high-volume, large-diameter temporary bypass pumping to maintain continuous sanitary sewer service; protection of existing structures and utilities; required permitting; utility coordination and relocation as necessary; and restoration of all disturbed areas.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Work includes removal and replacement of three (3) existing sanitary sewer interceptor manholes located in tidally influenced areas. Work includes demolition and removal of existing manholes; installation of new armorock polymer concrete manholes; connection to existing sewer piping; project dewatering; high-volume, large-diameter temporary bypass pumping to maintain continuous sanitary sewer service; protection of existing structures and utilities; required permitting; utility coordination and relocation as necessary; and restoration of all disturbed areas.
AvailableWork includes construction of sanitary sewer interceptor including approx 15,750 LF of 36", 24", 18", and 12" pipe, project will include four installations of steel casing by bore and abandonment of the lift station.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Work includes construction of sanitary sewer interceptor including approx 15,750 LF of 36", 24", 18", and 12" pipe, project will include four installations of steel casing by bore and abandonment of the lift station.
AvailableThe Glen Echo Interceptor Relief Sewer project is an Invitation for Bid for construction of a sewer relief system in Edgemere (District 15c7), including installation of a new sewer line, pump station, excavation/backfill, and associated pipe and fittings. The project follows Baltimore County standard construction specifications, has an approximate duration of 382 days, and the listing indicates an estimated budget range of $5,000,000–$10,000,000.
Posted Date
Sep 9, 2025
Due Date
Oct 7, 2027
Release: Sep 9, 2025
Close: Oct 7, 2027
The Glen Echo Interceptor Relief Sewer project is an Invitation for Bid for construction of a sewer relief system in Edgemere (District 15c7), including installation of a new sewer line, pump station, excavation/backfill, and associated pipe and fittings. The project follows Baltimore County standard construction specifications, has an approximate duration of 382 days, and the listing indicates an estimated budget range of $5,000,000–$10,000,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →