Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Village drainage construction project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for Qualifications for engineering services related to the design and construction management of a street and drainage improvement project for the City of Culloden.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
Request for Qualifications for engineering services related to the design and construction management of a street and drainage improvement project for the City of Culloden.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2026 North Pleasant Street Improvement Project.
Posted Date
Jan 30, 2026
Due Date
Feb 13, 2026
Release: Jan 30, 2026
Close: Feb 13, 2026
2026 North Pleasant Street Improvement Project.
AvailableRemoval and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
AvailableMill Street Drainage Improvements.The base bid consists of furnishing & installing drainage pipe, drainage structures, trench paving, and partial demolition & filling of a concrete bridge/culvert structure. The time for completion of this contract is 45 calendar days following the Notice to Proceed to start construction.
Posted Date
Jan 21, 2026
Due Date
Feb 6, 2026
Release: Jan 21, 2026
Close: Feb 6, 2026
Mill Street Drainage Improvements.The base bid consists of furnishing & installing drainage pipe, drainage structures, trench paving, and partial demolition & filling of a concrete bridge/culvert structure. The time for completion of this contract is 45 calendar days following the Notice to Proceed to start construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →