Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 100 CY of removal and legal disposal of foreign material during construction of the roadway or other structures, 50 LF of materials and work necessary for crack no. 1 filler/ cap seal, replacement & improvements including, but not limited to the demolition items, structural improvements, membrane thickener systems, piping, valves, canopies, 50 LF of materials and work necessary for crack no. 2 filler/ cap seal hairline cracks repair of concrete walls. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Consultant proposals for professional services to perform a comprehensive environmental audit for the Wastewater Treatment Plant (WWTP). This request invites qualified consultants to submit proposals for accomplishments of the items of work described under Scope of Services. Proposals shall be prepared and submitted in accordance with the requirements described in this Request for Proposals (RFP). The City is required to send the selected auditor information to the Iowa Department of Natural Resources (IDNR) for their approval.
Posted Date
Dec 30, 2025
Due Date
Jan 30, 2026
Release: Dec 30, 2025
Close: Jan 30, 2026
Consultant proposals for professional services to perform a comprehensive environmental audit for the Wastewater Treatment Plant (WWTP). This request invites qualified consultants to submit proposals for accomplishments of the items of work described under Scope of Services. Proposals shall be prepared and submitted in accordance with the requirements described in this Request for Proposals (RFP). The City is required to send the selected auditor information to the Iowa Department of Natural Resources (IDNR) for their approval.
AvailablePreliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
Posted Date
Jan 13, 2026
Due Date
Mar 31, 2026
Release: Jan 13, 2026
Close: Mar 31, 2026
Preliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
AvailableExamination announcement for Wastewater Treatment Plant / Water Treatment Plant Operator/Trainee positions for the City of Fulton.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Examination announcement for Wastewater Treatment Plant / Water Treatment Plant Operator/Trainee positions for the City of Fulton.
AvailableRemove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
Remove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis