Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1 LS clearing and drubbing; 581 CY unclassified excavation; 300 LF temporary silt fence; 441 SY solid slab sodding; 7,023 LB reinforcing steel; 163 TN type1-A plain riprap.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consist of culvert replacement.
Posted Date
Jan 7, 2026
Due Date
Mar 4, 2026
Release: Jan 7, 2026
Close: Mar 4, 2026
Project consist of culvert replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of culvert replacement.
Posted Date
-
Due Date
Mar 24, 2026
Release: -
Close: Mar 24, 2026
Project consists of culvert replacement.
AvailableWork includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Available1.Aluminum arch culvert replacement\r 2.Concrete street, sidewalk, and ditch replacement
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
1.Aluminum arch culvert replacement\r 2.Concrete street, sidewalk, and ditch replacement