Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water tower rehabilitation and repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a 0.3 MG Composite Elevated Water Storage Tank with associated piping and site work. Approximately 2,000 LF of 12" C900 watermain with associated appurtenances and connections.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Construction of a 0.3 MG Composite Elevated Water Storage Tank with associated piping and site work. Approximately 2,000 LF of 12" C900 watermain with associated appurtenances and connections.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new 1.0M elevated composite water tank and associated piping and site improvements.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of a new 1.0M elevated composite water tank and associated piping and site improvements.
AvailableConstruction of a new 1. 0m elevated composite water tank and associates piping and site improvements.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Construction of a new 1. 0m elevated composite water tank and associates piping and site improvements.
AvailableImprove and rehabilitate elevated water storage tank. The work includes cleaning, sandblasting, power tool cleaning, including proper handling and disposal of spent blast residue and other material, performing repairs and modifications to steel components, coordinating with corrpro and installing any required cathodic protection system components, and painting the interior and exterior of a 1,500,000 gallon fluted column elevated water storage tank. The work also includes disinfection and sampling as required to place the elevated tank back in service, as well as proper containment of blast and paint residue and clean-up of the site. Interior painting complete (dry area) 1 ls, waste disposal - non hazardous 550 ton, waste disposal - hazardous 50 tom, see attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 21, 2026
Release: Dec 19, 2025
Close: Jan 21, 2026
Improve and rehabilitate elevated water storage tank. The work includes cleaning, sandblasting, power tool cleaning, including proper handling and disposal of spent blast residue and other material, performing repairs and modifications to steel components, coordinating with corrpro and installing any required cathodic protection system components, and painting the interior and exterior of a 1,500,000 gallon fluted column elevated water storage tank. The work also includes disinfection and sampling as required to place the elevated tank back in service, as well as proper containment of blast and paint residue and clean-up of the site. Interior painting complete (dry area) 1 ls, waste disposal - non hazardous 550 ton, waste disposal - hazardous 50 tom, see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →