Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Cedar Corporation
The project consists of approx. 2 mi of rural road reconstruction. The work in general includes, but is not limited to, clearing and grubbing, removals, erosion control, common excavation, geogrid breaker run, crushed aggregate base course, hot mix asphalt, box culvert, culvert pipes, and site restoration. Work includes 25,800 SY of asphalt pavement removal; 13,135 CY of excavation, common; 34,425 SY of geotextile fabric, type sr; 13,000 CY of crushed aggregate base, roadway; 10,000 SY of temporary erosion mat, netted; 13,150 LF of temporary silt fence; 30,000 SY of hma, binder, 3. 0"; 100 LF of storm sewer, hdpe, 24"; 115 LF of storm sewer, hdpe, 36"; 2,120 TON of backfill structure type b - wdot 210. 2500; 470 TON of breaker run - wdot 311. 0115; 355 SY of geotextile fabric, type c - wdot 645. 0105; clearing & grubbing.
Posted Date
Jan 28, 2026
Due Date
Feb 11, 2026
Release: Jan 28, 2026
Cedar Corporation
Close: Feb 11, 2026
The project consists of approx. 2 mi of rural road reconstruction. The work in general includes, but is not limited to, clearing and grubbing, removals, erosion control, common excavation, geogrid breaker run, crushed aggregate base course, hot mix asphalt, box culvert, culvert pipes, and site restoration. Work includes 25,800 SY of asphalt pavement removal; 13,135 CY of excavation, common; 34,425 SY of geotextile fabric, type sr; 13,000 CY of crushed aggregate base, roadway; 10,000 SY of temporary erosion mat, netted; 13,150 LF of temporary silt fence; 30,000 SY of hma, binder, 3. 0"; 100 LF of storm sewer, hdpe, 24"; 115 LF of storm sewer, hdpe, 36"; 2,120 TON of backfill structure type b - wdot 210. 2500; 470 TON of breaker run - wdot 311. 0115; 355 SY of geotextile fabric, type c - wdot 645. 0105; clearing & grubbing.
Cedar Corporation
Remove and replace an existing carp barrier and boat passage gate with a new system on green lake. The work, in general, will include the following schedule of work: base bid: carp barrier removal and construction of new barrier timber piles rolling gate rip rap electrical erosion control.
Posted Date
Dec 23, 2025
Due Date
Mar 11, 2026
Release: Dec 23, 2025
Cedar Corporation
Close: Mar 11, 2026
Remove and replace an existing carp barrier and boat passage gate with a new system on green lake. The work, in general, will include the following schedule of work: base bid: carp barrier removal and construction of new barrier timber piles rolling gate rip rap electrical erosion control.
Cedar Corporation
Removals, sewer and water laterals, curb and gutter replacement, concrete sidewalk, asphalt paving, street repair, and site restoration in the Hideaway Subdivision.
Posted Date
Sep 20, 2024
Due Date
Oct 4, 2024
Release: Sep 20, 2024
Cedar Corporation
Close: Oct 4, 2024
Removals, sewer and water laterals, curb and gutter replacement, concrete sidewalk, asphalt paving, street repair, and site restoration in the Hideaway Subdivision.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Cedar Corporation's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database