Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project work consists of widening the off ramp.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project work consists of cured in place pipelining for culverts on US 50 and I-70 at various locations.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Project work consists of cured in place pipelining for culverts on US 50 and I-70 at various locations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the demolition, environmental inspection, abatement, removal, and disposal of residential structures and appurtenances within the project rights of way for the I-73 Widening Project.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the demolition, environmental inspection, abatement, removal, and disposal of residential structures and appurtenances within the project rights of way for the I-73 Widening Project.
Available1 LS clearing and grubbing, 8,599 CY unclassified excavation, 10,328 SY cement treated base, 9,046 SY dowel jointed PCC pavement placement, 50 CY class AA concrete, 5,080 LF sawing pavement, 213 LF beam guardrail w-beam single, 351.740 LF prestressed concrete beams (type III), 169 LF piles, driven HP 12X53, 20,764 LF SP traffic stripe plural-component 6" wide, 60 LF 2" PVC sch.40 plastic conduit trenched. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
1 LS clearing and grubbing, 8,599 CY unclassified excavation, 10,328 SY cement treated base, 9,046 SY dowel jointed PCC pavement placement, 50 CY class AA concrete, 5,080 LF sawing pavement, 213 LF beam guardrail w-beam single, 351.740 LF prestressed concrete beams (type III), 169 LF piles, driven HP 12X53, 20,764 LF SP traffic stripe plural-component 6" wide, 60 LF 2" PVC sch.40 plastic conduit trenched. See attached file.
AvailableThis RFP is for Crack Sealing & Joint Overlay Repairs on I-495 from Exit 48 to Exit 64 in the Towns of Huntington, Smithtown, Islip, and Brookhaven.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
This RFP is for Crack Sealing & Joint Overlay Repairs on I-495 from Exit 48 to Exit 64 in the Towns of Huntington, Smithtown, Islip, and Brookhaven.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →