Summary
Work includes removal of concrete paved ditch 23 SY, removal of delineator, all types 3 EA, removal of guard rail 115 LF, removal of pavement, all types and depths 930 SY, removal of sign including post & footing 8 EA, unclassified excavation, fm, ah 137 CY, borrow excavation, ah, fme, class b7 649 CY, vegetative materials for mulch 4 Ton, solid sodding 133 SY, agricultural limestone, temporary grassing 2 Acre, fine milling of bituminous pavement, all depths 4968 SY, asphalt for tack coat 1329 Gal, temporary traffic stripe, continuous white 5,488 LF, temporary traffic stripe, continuous yellow 1,568 LF, concrete median barrier, precast 1300 LF. See attached file.