Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Central Missouri (UCM) requests qualifications from professional A/E firms to provide design and related services for a new Welcome Center and an exterior facelift of the Grinstead and Utt buildings on the UCM campus in Warrensburg, MO. The selected firm will provide programming verification, schematic design, cost estimating, coordination with university and City of Warrensburg stakeholders, compliance with building and accessibility codes, bidding documents for Construction Manager at Risk (CMR), and construction administration through project closeout. The project is expected to begin with contract execution in March 2026, construction starting in October 2026, and substantial completion targeted for July 1, 2027.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of Architect/Engineering professional design services for the University of Central Missouri Welcome Center and an exterior facelift to the Grinstead and Utt Buildings.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Procurement of Architect/Engineering professional design services for the University of Central Missouri Welcome Center and an exterior facelift to the Grinstead and Utt Buildings.
AvailableDESIGN-BUILD: Design and construction services for the Women's Community Correctional Center-Kitchen expansion and related improvements.
Posted Date
Nov 7, 2025
Due Date
Mar 27, 2026
Release: Nov 7, 2025
Close: Mar 27, 2026
DESIGN-BUILD: Design and construction services for the Women's Community Correctional Center-Kitchen expansion and related improvements.
AvailableThe Government Publishing Office (GPO) is soliciting architectural and engineering (A/E) design services to replace and/or retrofit Freight Elevator #12 in Building A at the GPO facility in Washington, DC. The A/E firm will provide investigation of existing conditions, review as-built drawings, progressive design deliverables (35%, 65%, 95%, 100%), cost estimates, bid phase services, construction period services, and final record/as-built drawings. Proposals will be evaluated chiefly on technical capability, design management approach, relevant experience, key personnel qualifications, and past performance; a mandatory site visit is scheduled for December 17, 2025.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
The Government Publishing Office (GPO) is soliciting architectural and engineering (A/E) design services to replace and/or retrofit Freight Elevator #12 in Building A at the GPO facility in Washington, DC. The A/E firm will provide investigation of existing conditions, review as-built drawings, progressive design deliverables (35%, 65%, 95%, 100%), cost estimates, bid phase services, construction period services, and final record/as-built drawings. Proposals will be evaluated chiefly on technical capability, design management approach, relevant experience, key personnel qualifications, and past performance; a mandatory site visit is scheduled for December 17, 2025.
The University of Central Missouri (UCM) seeks qualifications from professional architecture/engineering firms to provide design services for demolition of the existing Yeater Hall and construction of a new suite-style residence hall (approximately 280–360 beds) delivered under a Construction Manager at Risk (CMAR) model. The selected firm will produce plans and specifications, coordinate with university and municipal stakeholders, perform construction administration tasks, and ensure compliance with the 2021 ICC codes and ADA requirements. The contract is expected to start March 1, 2026, with construction beginning June 2027 and substantial completion by July 1, 2028.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
The University of Central Missouri (UCM) seeks qualifications from professional architecture/engineering firms to provide design services for demolition of the existing Yeater Hall and construction of a new suite-style residence hall (approximately 280–360 beds) delivered under a Construction Manager at Risk (CMAR) model. The selected firm will produce plans and specifications, coordinate with university and municipal stakeholders, perform construction administration tasks, and ensure compliance with the 2021 ICC codes and ADA requirements. The contract is expected to start March 1, 2026, with construction beginning June 2027 and substantial completion by July 1, 2028.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis