Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
United States Government Publishing Office
The Government Publishing Office (GPO) is soliciting architectural and engineering (A/E) design services to replace and/or retrofit Freight Elevator #12 in Building A at the GPO facility in Washington, DC. The A/E firm will provide investigation of existing conditions, review as-built drawings, progressive design deliverables (35%, 65%, 95%, 100%), cost estimates, bid phase services, construction period services, and final record/as-built drawings. Proposals will be evaluated chiefly on technical capability, design management approach, relevant experience, key personnel qualifications, and past performance; a mandatory site visit is scheduled for December 17, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
South Carolina Department of Employment and Workforce
The South Carolina Department of Employment and Workforce seeks a contractor to repair deficiencies noted in the annual inspection of elevators at the David Building, including renovations to three passenger elevators and one freight elevator. The construction cost is estimated between $35,000 and $60,000 and the project location is 1550 Gadsden Street, Columbia, SC 29201. Quotes are due December 11, 2025 at 2:00 PM local time; project documents are available from the agency project coordinator, George Holmstrom.
Posted Date
Dec 4, 2025
Due Date
Dec 11, 2025
Release: Dec 4, 2025
South Carolina Department of Employment and Workforce
Close: Dec 11, 2025
The South Carolina Department of Employment and Workforce seeks a contractor to repair deficiencies noted in the annual inspection of elevators at the David Building, including renovations to three passenger elevators and one freight elevator. The construction cost is estimated between $35,000 and $60,000 and the project location is 1550 Gadsden Street, Columbia, SC 29201. Quotes are due December 11, 2025 at 2:00 PM local time; project documents are available from the agency project coordinator, George Holmstrom.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Harris County Metropolitan Transit Authority
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Harris County Metropolitan Transit Authority
Close: Dec 17, 2025
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
AvailableHarris County Metropolitan Transit Authority
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Harris County Metropolitan Transit Authority
Close: Dec 17, 2025
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
AvailableUniversity Of Washington Seattle Campus
Provide progressive design-build services for design and construction of replacement of two transformers and modernization of three passenger and one freight elevator at the Magnuson Health Sciences Building (MHSB) BB Wing. Desired qualifications of the design-build team include a builder and an architect/designer with experience renovating critical medium voltage electrical and vertical infrastructure in an active health sciences education building adjacent to the UW Medical Center Montlake Hospital that operates 24/7.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
University Of Washington Seattle Campus
Close: Jan 15, 2026
Provide progressive design-build services for design and construction of replacement of two transformers and modernization of three passenger and one freight elevator at the Magnuson Health Sciences Building (MHSB) BB Wing. Desired qualifications of the design-build team include a builder and an architect/designer with experience renovating critical medium voltage electrical and vertical infrastructure in an active health sciences education building adjacent to the UW Medical Center Montlake Hospital that operates 24/7.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →